Welcome to our blog

 

Here you can add some text to explain what your blog is about and a bit about you. You can also add a photo of yourself into the picture frame above.

By galson, Oct 19 2016 02:35PM

The new turbines have been operating now for just over 12 months. The total production was 9,208 MegaWatt Hours which equates to a load factor of 38.9% against a target of 37.5%. There were 13 days lost in planned grid maintenance shut-downs over the 12 months to end September.


Monthly production levels over spring and summer 2016 have been as follows :

March 601MWhs (67% of forecast)

April 673 MWhs (138% of forecast)

May 441 MWhs (82% of forecast)

June 553 MWhs (159% of forecast)

July 546MWhs (173% of forecast)

August 448MWhs (77% of forecast)

September 939MWhs (154% of forecast)

By galson, Mar 10 2016 02:26PM

The turbines have been performing well over the winter, the lastest statistics are as follows. There were various teething problems in October and November but from December production has been above forecast.

In October 2015 production was 730.262 MWhs, representing 84% of forecast;

In November 2016 production was 877.230 MWhs, representing 79% of forecast;

In December 2016 production was 1,326.843 MWhs, representing 117% of forecast;

In January 2016 production was 1,191.524 MWhs, representing 107% of forecast;

In February 2016 production was 900.196 MWhs, representing 113% of forecast.


(Forecasts based on 37.5% load factor).